Backed by Illinois energy legislation

Counties / Ogle County

Battery Storage Leases in Ogle County

Ogle County benefits from the Byron-Wayne 345 kV transmission corridor with over 545 MW of battery projects in the interconnection queue. Rural agricultural land near these high-capacity substations offers strong lease potential.

Estimated Annual Lease

$40,000

5 MW project (~0.5 acres)

Substations

7

With available capacity

vs Farm Rent

286x

$280/acre avg farm rent

Earnings by project size

Battery storage developers pay per megawatt of installed capacity. Here's what Ogle County landowners could earn:

Project SizeAnnual LeaseLand Neededvs Farm Rent
2 MW$16,000/yr~0.2 acres286x more
5 MW$40,000/yr~0.5 acres286x more
10 MW$80,000/yr~1 acres286x more
20 MW$160,000/yr~2 acres286x more

Grid infrastructure in Ogle County

Ogle County has 7 ComEd substations that may have available capacity for battery storage interconnection. Key substations include:

MarylandByronStillman Valley

Not every property near a substation will qualify. Available capacity, queue depth, and feeder configuration determine viability. Our team evaluates each site individually at no cost.

Common questions from Ogle County landowners

How much can I earn from a battery storage lease in Ogle County?

Based on current industry rates, Ogle County landowners can earn $40,000 to $80,000 per year from a 5-10 MW battery storage project. This uses only 0.5 to 1 acre of land. Current average farm cash rent in Ogle County is $280/acre/year (USDA NASS 2024).

Does my land in Ogle County qualify?

Ogle County is in the ComEd service territory with 7 substations. Whether your specific property qualifies depends on proximity to a substation with available interconnection capacity. Submit a free assessment at illinoisbattery.com/apply to find out.

How much land do I need?

A typical battery storage project needs 0.2 to 2 acres — far less than solar. A 5 MW project uses about 0.5 acres. The rest of your property stays in production.

Is there any cost to me?

No. The developer covers all costs — permitting, construction, equipment, maintenance, and insurance. There is no cost to the landowner at any point.

Towns in Ogle County

Explore battery storage opportunities near specific towns in Ogle County:

Own land in Ogle County?

Find out if your property qualifies for a battery storage lease. Free assessment, no obligation.