Backed by Illinois energy legislationBattery energy storage is supported by Illinois state energy legislation
Counties / Peoria County / Chillicothe
Chillicothe on the Illinois River in northern Peoria County sits downstream from the Powerton generating station. The dense substation network in this region — 39 across the county — creates abundant grid access for battery storage on nearby farmland.
Estimated Annual Lease
$40,000
5 MW project (~0.5 acres)
Nearby Substations
39
Up to 750 MW capacity
County
Peoria
Peoria County, IL
The Chillicothe area has 39 ComEd substations with up to 750 MW of capacity for battery storage interconnection. Key connection points include:
Properties within 2-5 miles of these substations are the most viable for battery storage leases. Our team evaluates proximity, feeder infrastructure, and available capacity for each property at no cost.
Battery storage developers pay per megawatt of installed capacity. Here's what landowners near Chillicothe could earn:
| Project Size | Annual Lease | Land Needed | 25-Year Total |
|---|---|---|---|
| 2 MW | $16,000/yr | ~0.2 acres | $500,000 |
| 5 MW | $40,000/yr | ~0.5 acres | $1,250,000 |
| 10 MW | $80,000/yr | ~1 acres | $2,500,000 |
| 20 MW | $160,000/yr | ~2 acres | $5,000,000 |
Fill out a short form with your property location near Chillicothe. Takes about two minutes.
We evaluate your property's proximity to Chillicothe-area substations, available interconnection capacity, and grid infrastructure.
If your property qualifies, we present lease terms with annual payment amounts, duration, and escalation schedule.
Once signed, the developer handles permitting and construction. You start receiving lease payments.
If your property is within a few miles of a ComEd substation with available interconnection capacity in the Chillicothe area, it may qualify. Peoria County has 39 substations with up to 750 MW of capacity. Submit a free assessment to find out.
Battery storage needs only 0.2-2 acres — far less than solar. A typical 5 MW project uses about 0.5 acres. The rest of your property stays in production.
No. The installation is a small fenced area — typically the size of a few shipping containers on a concrete pad. Farmers report no impact on planting, harvesting, drainage, or equipment access.
None. The developer covers everything — permitting, construction, equipment, maintenance, and insurance. The assessment is also free with no obligation.
Find out if your property qualifies for a battery storage lease. Free assessment, no obligation.