Backed by Illinois energy legislationBattery energy storage is supported by Illinois state energy legislation
Counties / Woodford County / El Paso
El Paso along I-39 in eastern Woodford County connects the McLean and Peoria transmission networks. Local substation infrastructure and 400 MW of queued capacity make the surrounding corn and soybean fields strong candidates for battery storage leases.
Estimated Annual Lease
$40,000
5 MW project (~0.5 acres)
Nearby Substations
6
Up to 400 MW capacity
County
Woodford
Woodford County, IL
The El Paso area has 6 ComEd substations with up to 400 MW of capacity for battery storage interconnection. Key connection points include:
Properties within 2-5 miles of these substations are the most viable for battery storage leases. Our team evaluates proximity, feeder infrastructure, and available capacity for each property at no cost.
Battery storage developers pay per megawatt of installed capacity. Here's what landowners near El Paso could earn:
| Project Size | Annual Lease | Land Needed | 25-Year Total |
|---|---|---|---|
| 2 MW | $16,000/yr | ~0.2 acres | $500,000 |
| 5 MW | $40,000/yr | ~0.5 acres | $1,250,000 |
| 10 MW | $80,000/yr | ~1 acres | $2,500,000 |
| 20 MW | $160,000/yr | ~2 acres | $5,000,000 |
Fill out a short form with your property location near El Paso. Takes about two minutes.
We evaluate your property's proximity to El Paso-area substations, available interconnection capacity, and grid infrastructure.
If your property qualifies, we present lease terms with annual payment amounts, duration, and escalation schedule.
Once signed, the developer handles permitting and construction. You start receiving lease payments.
If your property is within a few miles of a ComEd substation with available interconnection capacity in the El Paso area, it may qualify. Woodford County has 6 substations with up to 400 MW of capacity. Submit a free assessment to find out.
Battery storage needs only 0.2-2 acres — far less than solar. A typical 5 MW project uses about 0.5 acres. The rest of your property stays in production.
No. The installation is a small fenced area — typically the size of a few shipping containers on a concrete pad. Farmers report no impact on planting, harvesting, drainage, or equipment access.
None. The developer covers everything — permitting, construction, equipment, maintenance, and insurance. The assessment is also free with no obligation.
Find out if your property qualifies for a battery storage lease. Free assessment, no obligation.