Backed by Illinois energy legislation

Counties / DeKalb County / Genoa

Battery Storage Leases Near Genoa, IL

Genoa in northeastern DeKalb County has its own named substation feeding into the county's 372 MW battery interconnection pipeline. Farmland between Genoa and the Glidden substation corridor is actively being evaluated by energy storage developers.

Estimated Annual Lease

$40,000

5 MW project (~0.5 acres)

Nearby Substations

11

Up to 372 MW capacity

County

DeKalb

DeKalb County, IL

Grid infrastructure near Genoa

The Genoa area has 11 ComEd substations with up to 372 MW of capacity for battery storage interconnection. Key connection points include:

GliddenSandwichGenoaWaterman

Properties within 2-5 miles of these substations are the most viable for battery storage leases. Our team evaluates proximity, feeder infrastructure, and available capacity for each property at no cost.

What Genoa-area landowners can earn

Battery storage developers pay per megawatt of installed capacity. Here's what landowners near Genoa could earn:

Project SizeAnnual LeaseLand Needed25-Year Total
2 MW$16,000/yr~0.2 acres$500,000
5 MW$40,000/yr~0.5 acres$1,250,000
10 MW$80,000/yr~1 acres$2,500,000
20 MW$160,000/yr~2 acres$5,000,000

How to get started near Genoa

1

Tell us about your property

Fill out a short form with your property location near Genoa. Takes about two minutes.

2

We check your site

We evaluate your property's proximity to Genoa-area substations, available interconnection capacity, and grid infrastructure.

3

Review a lease offer

If your property qualifies, we present lease terms with annual payment amounts, duration, and escalation schedule.

4

Start earning

Once signed, the developer handles permitting and construction. You start receiving lease payments.

Questions from Genoa-area landowners

Can I lease my land for battery storage near Genoa?

If your property is within a few miles of a ComEd substation with available interconnection capacity in the Genoa area, it may qualify. DeKalb County has 11 substations with up to 372 MW of capacity. Submit a free assessment to find out.

How much land do I need near Genoa?

Battery storage needs only 0.2-2 acres — far less than solar. A typical 5 MW project uses about 0.5 acres. The rest of your property stays in production.

Will this affect my farming?

No. The installation is a small fenced area — typically the size of a few shipping containers on a concrete pad. Farmers report no impact on planting, harvesting, drainage, or equipment access.

Is there any cost to me?

None. The developer covers everything — permitting, construction, equipment, maintenance, and insurance. The assessment is also free with no obligation.

Own land near Genoa?

Find out if your property qualifies for a battery storage lease. Free assessment, no obligation.