Backed by Illinois energy legislationBattery energy storage is supported by Illinois state energy legislation
Counties / Grundy County / Morris
Morris and Grundy County sit at a critical grid junction near the Dresden nuclear station where major 345 kV lines converge. With 740 MW of battery projects queued, this is one of the most active areas for energy storage in Illinois.
Estimated Annual Lease
$40,000
5 MW project (~0.5 acres)
Nearby Substations
5
Up to 740 MW capacity
County
Grundy
Grundy County, IL
The Morris area has 5 ComEd substations with up to 740 MW of capacity for battery storage interconnection. Key connection points include:
Properties within 2-5 miles of these substations are the most viable for battery storage leases. Our team evaluates proximity, feeder infrastructure, and available capacity for each property at no cost.
Battery storage developers pay per megawatt of installed capacity. Here's what landowners near Morris could earn:
| Project Size | Annual Lease | Land Needed | 25-Year Total |
|---|---|---|---|
| 2 MW | $16,000/yr | ~0.2 acres | $500,000 |
| 5 MW | $40,000/yr | ~0.5 acres | $1,250,000 |
| 10 MW | $80,000/yr | ~1 acres | $2,500,000 |
| 20 MW | $160,000/yr | ~2 acres | $5,000,000 |
Fill out a short form with your property location near Morris. Takes about two minutes.
We evaluate your property's proximity to Morris-area substations, available interconnection capacity, and grid infrastructure.
If your property qualifies, we present lease terms with annual payment amounts, duration, and escalation schedule.
Once signed, the developer handles permitting and construction. You start receiving lease payments.
If your property is within a few miles of a ComEd substation with available interconnection capacity in the Morris area, it may qualify. Grundy County has 5 substations with up to 740 MW of capacity. Submit a free assessment to find out.
Battery storage needs only 0.2-2 acres — far less than solar. A typical 5 MW project uses about 0.5 acres. The rest of your property stays in production.
No. The installation is a small fenced area — typically the size of a few shipping containers on a concrete pad. Farmers report no impact on planting, harvesting, drainage, or equipment access.
None. The developer covers everything — permitting, construction, equipment, maintenance, and insurance. The assessment is also free with no obligation.
Find out if your property qualifies for a battery storage lease. Free assessment, no obligation.