Peru along I-80 and the Illinois River in western LaSalle County is a regional commercial center with strong grid infrastructure. The LaSalle and Marseilles substations nearby support 250 MW of battery interconnection, drawing developer attention to surrounding farmland.
Estimated Annual Lease
$40,000
5 MW project (~0.5 acres)
Nearby Substations
11
Up to 250 MW capacity
County
LaSalle
LaSalle County, IL
The Peru area has 11 ComEd substations with up to 250 MW of capacity for battery storage interconnection. Key connection points include:
Properties within 2-5 miles of these substations are the most viable for battery storage leases. Our team evaluates proximity, feeder infrastructure, and available capacity for each property at no cost.
Battery storage developers pay per megawatt of installed capacity. Here's what landowners near Peru could earn:
| Project Size | Annual Lease | Land Needed | 25-Year Total |
|---|---|---|---|
| 2 MW | $16,000/yr | ~0.2 acres | $500,000 |
| 5 MW | $40,000/yr | ~0.5 acres | $1,250,000 |
| 10 MW | $80,000/yr | ~1 acres | $2,500,000 |
| 20 MW | $160,000/yr | ~2 acres | $5,000,000 |
Fill out a short form with your property location near Peru. Takes about two minutes.
We evaluate your property's proximity to Peru-area substations, available interconnection capacity, and grid infrastructure.
If your property qualifies, we present lease terms with annual payment amounts, duration, and escalation schedule.
Once signed, the developer handles permitting and construction. You start receiving lease payments.
If your property is within a few miles of a ComEd substation with available interconnection capacity in the Peru area, it may qualify. LaSalle County has 11 substations with up to 250 MW of capacity. Submit a free assessment to find out.
Battery storage needs only 0.2-2 acres — far less than solar. A typical 5 MW project uses about 0.5 acres. The rest of your property stays in production.
No. The installation is a small fenced area — typically the size of a few shipping containers on a concrete pad. Farmers report no impact on planting, harvesting, drainage, or equipment access.
None. The developer covers everything — permitting, construction, equipment, maintenance, and insurance. The assessment is also free with no obligation.
Find out if your property qualifies for a battery storage lease. Free assessment, no obligation.