Backed by Illinois energy legislationBattery energy storage is supported by Illinois state energy legislation
Counties / Bureau County / Walnut
Walnut along I-80 in northern Bureau County offers easy access to the interstate corridor that parallels key transmission lines. With 17 substations across the county, surrounding farmland is well-suited for battery energy storage development.
Estimated Annual Lease
$40,000
5 MW project (~0.5 acres)
Nearby Substations
17
Up to 150 MW capacity
County
Bureau
Bureau County, IL
The Walnut area has 17 ComEd substations with up to 150 MW of capacity for battery storage interconnection. Key connection points include:
Properties within 2-5 miles of these substations are the most viable for battery storage leases. Our team evaluates proximity, feeder infrastructure, and available capacity for each property at no cost.
Battery storage developers pay per megawatt of installed capacity. Here's what landowners near Walnut could earn:
| Project Size | Annual Lease | Land Needed | 25-Year Total |
|---|---|---|---|
| 2 MW | $16,000/yr | ~0.2 acres | $500,000 |
| 5 MW | $40,000/yr | ~0.5 acres | $1,250,000 |
| 10 MW | $80,000/yr | ~1 acres | $2,500,000 |
| 20 MW | $160,000/yr | ~2 acres | $5,000,000 |
Fill out a short form with your property location near Walnut. Takes about two minutes.
We evaluate your property's proximity to Walnut-area substations, available interconnection capacity, and grid infrastructure.
If your property qualifies, we present lease terms with annual payment amounts, duration, and escalation schedule.
Once signed, the developer handles permitting and construction. You start receiving lease payments.
If your property is within a few miles of a ComEd substation with available interconnection capacity in the Walnut area, it may qualify. Bureau County has 17 substations with up to 150 MW of capacity. Submit a free assessment to find out.
Battery storage needs only 0.2-2 acres — far less than solar. A typical 5 MW project uses about 0.5 acres. The rest of your property stays in production.
No. The installation is a small fenced area — typically the size of a few shipping containers on a concrete pad. Farmers report no impact on planting, harvesting, drainage, or equipment access.
None. The developer covers everything — permitting, construction, equipment, maintenance, and insurance. The assessment is also free with no obligation.
Find out if your property qualifies for a battery storage lease. Free assessment, no obligation.